Product Detail :
|
Balance work of construction of two-lane with hard shoulders of changtongya- longleng road on epc basis from existing km 16+530 to km 29+530 [design km.18+779 to km. 31+779] (design length – 13+000 km) in the state of nagaland (pkg- 2) under nh (o) plan.
|